Sign In | Join Free | My lightneasy.org |
|
Brand Name : China Harzone
Certification : ISO9001:2015
Place of Origin : Hubei,China
MOQ : 1set
Price : Negotiated
Supply Ability : 40000 Ton/Tons per Year
Standard : AiSi, ASTM, BS, GB
Name : Temporary Modular Bridge
Type : Temporary Bridge
Application : Steel Structure Bridge
Processing Service : Bending, Welding, Decoiling, Cutting, Punching
Certificate : ISO9001:2015
Structure type : Steel Truss Bridge
Steel Structure Temporary Modular Bridge Short Construction Period
Temporary Modular Bridge Description:
The basic component of Temporary Modular Bridge consists of girder, deck, frame connecting structure, bridge end structure and gateway structure. The girder is composed of panel, panel pin (include safety circlip) and chord reinforcement. The deck is composed of transom, bridge plate and kerb. The frame structure is composed of raker, bracing frame, vertical frame, sway brace and vertical component. The bridge end section is composed of end post, lower bearing and frame plate. The gateway structure is composed of ramp, ramp bearing and end plate.
Temporary Modular Bridge adopts modular design, featuring a large span,short construction period,fast erection, multiple reuses of bridge components. It has excellent interchangeability and connection ferformance. The bridge structure can be designed according to the bridge span and load requirement,which can quickly construct a temporay or semi-permanent bridge.
Temporary Modular Bridge Specifications:
Type | CB100 |
Designed Span | 6-60m |
Designed Load | HS25-44,Axle Load 20t,tracked load 50t |
Panel Dimension | 1.448*3.048m |
Carriageway Width | 4.2m/7.35m |
Deck type | steel deck/ wood deck |
![]() |
Steel Structure Temporary Modular Bridge Short Construction Period Images |